Activities > Project Experiences Of Cansu Energy Team

“CANSU Enerji Hizmetleri Yatırım Ticaret ltd. Şti. (Cansu Enerji)”

In Electromechanical Equipment Supply Side:

The projects under production and construction which are contracted as the representative of the Supplier Companies Yunhe, BITC and CNEEC in China are:

      Hydro PPs:

  • 49 MW Bayramhacılı Dam and HEPP project of Soyak Holding (BITC),
  • 99 MW Güllübağ Dam and HEPP project of Soyak Holding (BITC),
  • 5 MW Hasanlar HEPP of Soyak Holding (YUNHE),
  • 18 MW Arca HEPP of Güriş Holding (YUNHE),
  • 21 MW Çobanlar HEPP of Yüksel Group (YUNHE),
  • 26 MW Devecikonağı HEPP of BM Holding (YUNHE),
  • 31 MW Serap HEPP of Ünal Group (YUNHE),
  • 17 MW Değirmen HEPP of Kayis Enerji (YUNHE)

      Thermal PPs:

  • Additionally, 50 MW Combined cycle power plant for Sevastopol Invest/Ukraine (CNEEC)

In Consultancy Side:

      a.) In Distribution side:

  • Preliminary & Feasibility study for 800 MW CCNG power project (ongoing project)(Yüksel Group)
  • Preliminary & Feasibility Study for 300 MW CCNG power project (ongoing project)
  • Preliminary & Feasibility study for 800 MW CCNG power project (Çeltik Enerji)
  • Feasibility study, preparation of technical spesification and for owner’s engineering of Dinepropetrovsk100 MW Co-generation Plant for Tekhcom Ukraine in Ukraine (for electricity and heating prurpose).
  • Feasibility study and technical spesification for 30 MW İliçovky natural gas co generation power plant and city heating (ongoing study), in Uraine.
  • Owner’s engineering for for 50 MW natural gas combined cycle power plant for Sevastopol Invest/Ukraine for electricity and city heatingpurposes (EPC Contract sas signed with CNEEC for construction).
  • Technical evaluation of a 400 MW natural gas power plant for a private company for equization (Limak Holding)).
  • Tecnical data analisis of a EÜAŞ’s large scale Thermal PP (Akenerji)
  • Owner’s engineering for Balıkesir coal fired thermal power plant (2x 50 MW) for Brightwell (ongoing study-at the beginning of tender stage).
  • Feasibility study for lignite based Afşin-Elbistan C and D projects including minings (each 1.200 MW) for Akfen Holding).
  • Due diligence on an energy generation company for Akfen Holding.
  • Feasibility study for 700 MW Silivri Natural Gas Power Plant for Demir Enerji.
  • Feasibility study for 700 Iğdır Natural Gas Power Plant for Demir Enerji
  • Feasibility study for Hamitabat Natural Gas Power Power Plant for CORONA Co.
  • Project evaluation and feasibilty studies for 4 state coal power plants and lignite fired in order to calculate offer price for privatization for CORONO Co.
  • Feasibility study for Ambarlı Natural Gas Power Power Plant for CORONA Co.
  • Feasibility study for 200 MW fuel-oil power plant for DKY Company
  • Feasibility study for 100 MW fuel-oil power plan for Pasiner Co. and Fernas group,
  • Feasibility study for Ambarlı Fuel-oil Power Plant for ŞA-RA Co.
  • Cooperation with ETC-IS Turkey (USA) for wind projects in Turkey.
  • Evaluation of 32 HEPPs for Zülfikarlar Group of Companies (Turkuaz Petrol).
  • Evaluation of four HEPPs for Dolçe Villla Tekstil Company.
  • Evaluation of four HEPPs for EVİTA TEKSTİL Company. Consultancy to ARC Company for HEPP project development.
  • Consultancy to YILDIZLAR ENERJİ ELEKTRİK ÜRETM AŞ for full satges of energy projects: Fallowing works have been realized and are beeing realized under this task:
    • Consultancy for re-design the Kulp I+IV HPP’s (under construction) and Gökbel I+II HPPs at licese stage
    • Cosultancy for project development (additional 9 HPPs were developed for the company)
  • Consultancy to ALSTOM POWER (France) together with SİNERJİ AKTİF for evaluation and ranking the HPPs which to be offered price.
  • Due diligence for EXPLO CONTROL (France) for EÜAŞ’s very small HPP’s.
  • Feasibility studies for Elektiricity Distribution regions of İstanbul Anatolian side and Trace for UNIT International.
  • Works for 8 Hydro-power projects development for HİDRO KONTROL Company in Black Sea region and consultancy for establishment of the technical project realisation team for Y.Manahoz HPP which is under operation.

      b.) In Generation side:

  • Feasibility study for Boğaziçi Electricity Distribution Region for Aksa Holding
  • Feasibility study for Fırat Electricity Distribution Region for Aksa Holding.
  • Feasibility studies for EÜAŞ’s small scale power plants to be privatized for Boydak Group of Companies.
  • Feasibility study for Vangölü Electricity Distribution Region for Aksa holding
  • Feasibility study for Fırat Electricity Distribution Region for Aksa Holding
  • Feasibility study for Çamlıbel Electricity Distribution Region for Aksa Holding
  • Feasibility study for Çoruh Electricity Distribution Region for Aksa Holding
  • Feasibility study for Osmangazi Electricity Distribution Region for Aksa Holding
  • Feasibility study for MERAM Electric Distribution Region for Akfen Holding.
  • Feasibility study for ARAS Electricity Distribution Region for INTER RAO (Russia).
  • Feasibility study for SAKARYA Electricity Distribution region for GLOBAL YATIRIM AŞ.
  • Feasibility study for Başkent Electricity Distribution region for GAMA-General Electric (USA) Consortium.
  • Feasibility study for Anatolian Side Electricity Distribution Study for Unit International,Co.

About Some Project